LETTER TO ARCHITECT AND EMPLOYER |
||
CLAUSE 1.4 – DISCREPANCY BETWEEN
CONTRACT DOCUMENTS |
||
1A |
- |
DISCREPANCY BETWEEN DRAWINGS AND BILL OF QUANTITIES -
1 |
2A |
- |
DISCREPANCY BETWEEN DRAWINGS AND BILL OF QUANTITIES -
2 |
3A |
- |
DISCREPANCY BETWEEN DRAWINGS – (DISCREPANCY IN
DIMENSION) |
4A |
- |
DISCREPANCY BETWEEN CONTRACT DOCUMENTS – A VARITION |
5A |
- |
DISCREPANCY AMONG CONTRACT DOCUMENTS – NOT A
VARIATION |
6A |
- |
DISCREPANCY BETWEEN CONTRACT DOCUMENTS – LATE
RESPONSE |
CLAUSE 2 – ARCHITECT’S INSTRUCTIONS |
||
7A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED
DURING TELE-CONVERSATION |
8A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING
SITE VISIT |
9A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED
DURING SITE MEETING |
10A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED BY
CLERK OF WORK |
11A |
- |
REQUEST AI FOR V.O WORKS – OBSTRUCTION BY ROCK |
12A |
- |
REQUEST AI FOR V.O WORKS – OBSTRUCTION BY UTILITY |
13A |
- |
DELAY IN RECEIVING AI – TO RESOLVE OBSTRUCTION |
14A |
- |
CONFIRMATION OF ARCHITECT’S INSTRUCTION FOR VARITION
ORDER |
CLAUSE 3 – CONTRACT DOCUMENTS &
WORK PROGRAM & SHOP DRAWINGS |
||
15A |
- |
NOTICE TO REMIND ARCHITECT – YET TO RECIVE CONTRACT
DOCUMENTS |
16A |
- |
NOTICE TO INFORM ARCHITECT - DATE WE RECEIVED CONTRACT
DOCUMENTS |
17A |
- |
SUBMISSION OF MASTER WORK PROGRAM |
18A |
- |
SUBMISSION OF REVISED MASTER WORK PROGRAM |
19A |
- |
REMINDER – REQUEST RESPONSE TO MASTER WORK PROGRAM |
20A |
- |
SUBMISSION OF SHOP DRAWINGS FOR MAIN CONTRACT WORKS |
21A |
- |
SUBMISSION OF SHOP DRAWINGS FOR ELECTRICAL WORKS |
22A |
- |
SUBMISSION OF SHOP DRAWINGS FOR MECHANICAL WORKS |
CLAUSE 4 – STATUTORY OLIGATIONS |
||
23A |
- |
LOCAL AUTHORITY APPROVAL FOR SITE OFFICE , STORES
& WORKER QUARTERS |
24A |
- |
LOCAL AUTHORITY REQUEST FOR SILT TRAP |
25A |
- |
APPROVAL FOR ELECTRICTY, TELEPHONE AND WATER SUPPLY
TO THE SITE OFFICE |
CLAUSE 5 – LEVELS AND SETTING OUT |
||
26A |
- |
REQUEST INFORMATION FOR SETTING OUT |
27A |
- |
SUBMISSION OF A TOPOGRAPHICAL SURVEY DATA |
28A |
- |
DISCREPANCY BETWEEN EXISTING GROUND LEVEL AND
CONTRACT DRAWIN |
CLAUSE 6 – MATERIALS, GOODS AND
WORKMANSHIP |
||
29A |
- |
SUBMISSION OF SAMPLES (INSERT MATERIAL NAME) |
30A |
- |
REQUEST REASON FOR REJECTION OF SAMPLE (INSERT MATERIAL NAME) |
31A |
- |
NOTICE TO REMIND - LATE APPROVAL FOR SAMPLE (INSERT MATERIAL NAME) |
32A |
- |
SUBMISSION OF METHOD STATEMENT (INSERT TYPE OF WORK) |
33A |
- |
SUBMISSION OF METHOD STATEMENT TO RECTIFY DEFECT |
34A |
- |
NOTICE TO REMIND - LATE APPROVAL OF METHOD STATEMENT |
35A |
- |
TESTING UNDER CLAUSE 6.3 |
CLAUSE 8 – SITE AGENT |
||
36A |
- |
PROPOSED PROJECT MANAGER - SITE AGENT |
37A |
- |
PROPOSED REPLACEMENT OF PROJECT MANAGER – SITE AGENT |
38A |
- |
REQUEST TO EXTEND WORKING HOURS & SUPERVISION |
39A |
- |
REQUEST TO EXTEND WORKING HOURS & SUPERVISION |
CLAUSE 11.1 – 11.4, – VARIATION
WORKS |
||
40A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED
DURING TELE-CONVERSATION |
41A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING
SITE VISIT |
42A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED
DURING SITE MEETING |
43A |
- |
REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED BY
CLERK OF WORK |
44A |
- |
REQUEST AI FOR V.O WORKS – OBSTRUCTION BY ROCK |
45A |
- |
REQUEST AI FOR V.O WORKS – OBSTRUCTION BY UTILITY |
46A |
- |
DELAY IN RECEIVING AI – TO RESOLVE OBSTRUCTION |
CLAUSE 11.5 – 11.9 – VALUATION OF
VARIATION |
||
47A |
- |
QUOTATION FOR V.O (INSERT
NO) & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES |
48A |
- |
SUBMISSION OF DETAIL FOR ADDITIONAL EXPENSE DUE TO
V.O WORKS – CL 11.7(b) |
48AB |
- |
QUOTATION FOR V.O (MARKET
RATE) & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES |
49A |
- |
SUBMISSION OF DETAIL FOR ADDITIONAL EXPENSE DUE TO
V.O WORKS – CL 11.7(b) |
49AB |
- |
QUOTATION FOR V.O (OLD
& NEW RATE) & INTENTION TO CLAIM FOR EOT & ADDITIONAL
EXPENSES |
50A |
- |
QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL
EXPENSES |
51A |
- |
QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL
EXPENSES |
52A |
- |
QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL
EXPENSES |
53A |
- |
REMINDER DUE TO LATE RESPONSE TO QUOTATION FOR V.O (INSERT NUMBER) |
54A |
- |
VARIATION ORDER NO (INSERT NO) - DISAGREEMENT WITH RATE PROPOSED BY QS |
55A |
- |
MONTHLY NOTICE TO CLAIM ADDITIONAL EXPENSES DUE TO
V.O WORKS – CLAUSE 11.7 (a) |
56A |
- |
MONTHLY SUBMISSION OF DETAIL & PARTICULARS FOR
ADDITIONAL EXPENSES - CLAUSE 11.7 (b) |
CLAUSE 12 – CONTRACT BILLS |
||
57A |
- |
NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS) |
58A |
- |
NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS |
59A |
- |
NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS) |
60A |
- |
NOTICE TO INFORM THAT DESCRIPTION OF WORKS IN BOQ IS
WRONG (INSERT ITEM NAME) |
61A |
- |
NOTICE TO INFORM THAT ACTUAL SITE QTY HIGHER THAN
QUANTITY STATED IN BOQ (INSERT ITEM
NAME) |
CLAUSE 15.1 – 15.3 – PRACTICAL COMPLETION |
||
62A |
- |
NOTIFICATION TO CARRY OUT TESTING AND COMMISSIONING |
63A |
- |
REQUEST FOR JOIN SITE INSPECTION AND CERTIFICATE OF
PRACTICAL COMPLETION |
64A |
- |
REQUEST FOR JOIN SITE INSPECTION AND CERTIFICATE OF
PRACTICAL COMPLETION |
65A |
- |
OBJECTION TO ARCHITECT’S DECISION TO WITHHOLD THE
ISSUANCE OF CPC |
66A |
- |
OBJECTION TO ARCHITECT’S DECISION TO WITHHOLD CPC DUE
TO DEFECTS OF MINOR NATURE |
67A |
|
NOTICE TO RETURN SITE POSSESSION TO EMPLOYER |
CLAUSE 15.4 – 15.6 – DEFECT LIABILITY PERIOD |
||
68A |
- |
SUBMISSION OF SCHEDULE FOR MAKING GOOD DEFECT |
69A |
- |
REQUEST FOR INSPECTION - COMPLETION OF MAKING GOOD DEFECT |
70A |
- |
PROTEST AGAINST APPOINTMENT OF OTHER THIRD PARTY TO
RECTIFY DEFECTS |
71A |
- |
NOTICE TO INFORM THE FOURTEEN (14) DAYS PERIOD HAD
LAPSED |
72A |
- |
NOTICE TO CONFIRM THAT THERE IS NO FINAL DEFECT LIST
AND REQUEST FOR CMGD |
73A |
- |
NOTICE TO INFORM THAT FINAL DEFECT LIST IS
INEFFECTIVE |
74A |
- |
REQUEST OF CERTIFICATE OF MAKING GOOD DEFECT |
75A |
- |
DELAY IN THE ISSUANCE OF CERTIFICATE OF MAKING GOOD
DEFECT |
CLAUSE 16 – PARTIAL POSSESSION |
||
76A |
- |
NOTICE TO HAND OVER FOR PARTIAL OCCUPATION |
77A |
- |
REQUEST FOR CERTIFICATE OF PARTIAL COMPLETION |
78A |
- |
REQUEST FOR RELEASE HALF OF RETENTION FUND FOR THE
OCCUPIED PARTS |
CLAUSE 19 – INSURANCES |
||
79A |
- |
SUBMISSION OF INSURANCE COVER NOTE AND PREMIUM
RECEIPT |
80A |
- |
SUBMISSION OF INSURANCE POLICY |
81A |
- |
EXTENSION OF INSURANCE COVERAGE |
82A |
- |
NOTICE TO CANCEL INSURANCE POLICY |
CLAUSE 21 – DATE OF COMMENCEMENT,
POSTPONEMENT & COMPLETION DATE |
||
83A |
- |
NOTICE TO RECORD LATE SITE POSSESSION – SITE
OBSTRUCTION |
84A |
- |
NOTICE TO RECORD LATE SITE POSSESSION - SITE IS NOT READY |
85A |
- |
REQUEST EOT & LOSS AND EXPENSE DUE TO LATE SITE
POSSESSION |
CLAUSE 22 – DAMAGE FOR
NON-COMPLETION |
||
86A |
- |
PROTEST AGAINST FAILURE TO CARRY OUT SYSTEMATIC
ANALYSIS – CNC INVALID |
87A |
- |
PROTEST AGAINST INVALID CNC - PROJECT TIME FOR
COMPLETION BECOMING AT LARGE |
88A |
- |
PROTEST AGAINST INVALID CNC – ENTITLED TO EOT DUE TO
OBSTRUCTIONS BY DELAY EVENTS |
89A |
- |
ENTITLED TO EOT - PROTEST AGAINST THE IMPOSITION OF
LIQUIDATED AND ASCERTAINED DAMAGES (LAD) |
90A |
- |
PROTEST AGAINST INVALID LAD – VIOLATION OF PROCEDURES
UNDER CLAUSE 22.1 & 23.4 |
CLAUSE 23 – EXTENSION OF TIME |
||
91A |
- |
MONTHLY NOTICE OF INTENTION TO CLAIM EOT UNDER CLAUSE
23.1 (a) |
91AB |
- |
MONTHLY APPLICATION FOR EOT – CLAUSE 23.1 (b) |
92A |
- |
NOTICE OF INTENTION TO CLAIM EOT – OBSTRUCTION BY
ROCK |
92AB |
- |
APPLICATION FOR EOT DUE TO ROCK OBSTRUCTION –
CL23.1(b) |
93A |
- |
NOTICE OF INTENTION TO CLAIM EOT – INCLEMENT WEATHER |
93AB |
- |
APPLICATION FOR EOT DUE TO INCLEMENT WEATHER – CL
23.1 (b) |
94A |
- |
NOTICE OF INTENTION TO CLAIM EOT – SITE OBSTRUCTIONS |
94AB |
- |
APPLICATION FOR EOT DUE TO SITE OBSTRUCTION – CL 23.1
(b) |
95A |
- |
NOTICE OF INTENTION TO CLAIM EOT – UTILITY
OBSTRUCTION |
95AB |
- |
APPLICATION FOR EOT DUE TO UTILITY OBSTRUCTION –
CL23.1(b) |
96A |
- |
NOTICE OF INTENTION TO CLAIM EOT – ACT OF PREVENTION
(LATE PAYMENT) |
96AB |
- |
APPLICATION FOR EOT DUE TO ACT OF PREVENTION (LATE
PAYMENT) – CL 23.1(b) |
97A |
- |
NOTICE OF INTENTION TO CLAIM EOT - ADDITONAL V.O WORKS |
97AB |
- |
APPLICATION FOR EOT DUE TO ADDITIONAL WORKS – CL
23.1(b) |
98A |
- |
NOTICE OF INTENTION TO CLAIM EOT - LATE RESPONSE OF RFI |
98AB |
- |
APPLICATION FOR EOT DUE TO LATE RESPONSE OF RFI – CL
23.1 (b) |
99A |
- |
NOTICE OF INTENTION TO CLAIM EOT – TERMINATION OF NSC |
99AB |
- |
APPLICATION FOR EOT DUE TO TERMINATION OF NSC – CL
23.1 (b) |
100A |
- |
NOTICE TO CLAIM EOT – LATE NOMINATION OF NSC |
100AB |
- |
APPLICATION FOR EOT DUE TO LATE NOMINATION OF NSC –
CL 23.1(b) |
101A |
- |
NOTICE OF INTENTION TO CLAIM EOT - DELAY BY THIRD
PARTY ENGAGED BY EMPLOYER |
101AB |
- |
APPLICATION FOR EOT DUE TO DELAY BY THIRD PARTY
ENGAGED BY EMPLOYER – CL23.1(b) |
102A |
- |
PROTEST AGAINST INSUFFICIENT EXTENSION OF TIME |
103A |
- |
PROTEST AGAINST INSUFFICIENT EXTENSION OF TIME -
REMINDER |
104A |
- |
PROTEST AGAINST FAILURE TO PROPERLY ADMINISTER CLAUSE
22 & 23 OF THE CONTRACT |
105A |
- |
REBUT ALLEGATION OF POOR PROGRESS & BEST
ENDEAVOUR |
106A |
- |
PROPOSED MITIGATION MEASURES TO REDUCE DELAY &
ACCELERATION COST |
CLAUSE 24 – LOSS AND EXPENSE |
||
107A |
- |
MONTHLY NOTICE OF INTENTION TO CLAIM LOSS &
EXPENSE – CL 24.1 (a) |
107AB |
- |
MONTHLY APLICATION FOR LOSS & EXPENSE CLAIM – CL
24.1 (b) |
108A |
- |
NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE
– LATE RESPONSE TO RFI |
108AB |
- |
APPLICATION FOR LOSS & EXPENSE DUE TO LATE
RESPONSE TO RFI – CL 24.1 (b |
109A |
- |
NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE –
LATE NOMINATION OF NSC |
109AB |
|
APPLICATION FOR LOSS & EXPENSE DUE TO LATE
NOMINATION OF NSC – CL 24.1 (b) |
110A |
|
NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE - SUSPENSION UNDER CLAUSE 30.7 |
110AB |
|
APPLICATION FOR LOSS & EXPENSE DUE TO SUSPENSION
UNDER CLAUSE 30.7 – CL 24.1(b) |
111A |
|
NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE DUE
TO LATE SUPPLY OF GOODS BY EMPLOYER |
111AB |
|
APPLICATION FOR LOSS & EXPENSE DUE TO LATE SUPPLY
OF GOODS BY EMPLOYER – CL 24.1 (b) |
112A |
|
PROTEST AGAINST UNDER CERTIFICATION OF LOSS &
EXPENSE |
CLAUSE 25 – DETERMINATION BY EMPLOYER |
||
113A |
- |
PROTEST AGAINST DEFAULT NOTICE – FAILURE DUE TO LATE PAYMENT |
114A |
- |
REPLY TO DEFAULT NOTICE – COMMITMENT TO ACCELERATE
PROGRESS |
CLAUSE 26 – DETERMINATION BY CONTRACTOR |
||
115A |
- |
NOTICE OF DEFAULT
- EMPLOYER’S FAILURE TO MAKE PAYMENT FOR CERTIFICATE NO (INSERT P.C NO) |
116A |
- |
NOTICE OF DEFAULT
- EMPLOYER’S FAILURE TO MAKE SEVERAL PAYMENTS |
117A |
- |
NOTICE TO DETERMINE OWN EMPLOYMENT - DUE TO EMPLOYER’S BREACH OF CONTRACT |
CLAUSE 27 – NOMINATED SUB-CONTRACTOR |
||
118A |
- |
REMINDER -
DELAY IN THE ISSUANCE OF NOMINATION INSTRUCTION FOR THE APPOINTMENT OF NSC |
119A |
- |
PROTEST AGAINST THE APPOINTMENT OF (INSERT CO NAME) AS NSC DUE TO
LOW PRICING |
120A |
- |
PROTEST AGAINST THE APPOINTMENT OF (INSERT CO NAME) AS NSC DUE TO POOR
PAST PERFORMANCE |
121A |
- |
PAYMENT TO NSC – DEDUCTION FOR DEFECTS RECTIFICATION
COSTS |
122A |
- |
PAYMENT TO NSC – DEDUCTION FOR LAD CHARGES |
CLAUSE 30.1 – 30.4 – CERTIFICATES
AND PAYMENTS |
||
123A |
- |
SUBMISSION OF PAYMENT APPLICATION NO (INSERT NUMBER) - 1 |
124A |
- |
SUBMISSION OF PAYMENT APPLICATION NO (INSERT NUMBER) - 2 |
125A |
- |
REQUEST FOR OVERDUE PAYMENT CERTIFICATE (INSERT NUMBER) - 1 |
126A |
- |
REQUEST FOR OVERDUE PAYMENT CERTIFICATE (INSERT NUMBER) - 2 |
127A |
- |
PROTEST AGAINST UNDER CERTIFIED PAYMENT CERTIFICATE (INSERT NUMBER) |
128A |
- |
PROTEST AGAINST UNDER CERTIFIED PAYMENT CERTIFICATE –
V.O WORKS |
129A |
- |
PROTEST AGAINST LATE PAYMENT AND INTENTION TO CLAIM
FOR LATE PAYMENT INTEREST |
130A |
- |
PROTEST AGAINST NON-PAYMENT FOR CERTIFICATE NO (INSERT NO) - 1 |
131A |
- |
PROTEST AGAINST LATE PAYMENT FOR CERTIFICATE NO (INSERT NO) - 2 |
CLAUSE 30.5 – 30.6 – RETENTION FUND |
||
132A |
- |
REQUEST FOR RETENTION MONEY TO BE KEPT INTO A TRUST
ACCOUNT |
133A |
- |
REMINDER - RETENTION MONEY TO BE PAID INTO TRUST
ACCOUNT |
134A |
- |
REQUEST TO RELEASE ONE HALF OF RETENTION FUND AFTER
ISSUANCE OF CPC |
135A |
- |
REMINDER - RELEASE ONE HALF OF RETENTION FUND AFTER
ISSUANCE OF CPC |
136A |
- |
REQUEST TO RELEASE ONE HALF OF RETENTION FUND AFTER
ISSUANCE OF CMGD |
CLAUSE 30.7 – SUSPENSION OF WORKS |
||
137A |
- |
NOTICE OF INTENTION TO SUSPEND WORKS DUE TO PAYMENT
ISSUE |
138A |
- |
NOTICE TO SUSPEND WORKS DUE TO PAYMENT ISSUE |
CLAUSE 30.10 – FINAL ACCOUNT AND
PAYMENT |
||
139A |
- |
SUBMISSION OF DETAILS AND PARTICULARS FOR FINAL
ACCOUNT |
140A |
- |
SUBMISSION OF DETAILS AND PARTICULARS FOR FINAL
ACCOUNT |
141A |
- |
REMINDER – LATE ISSUANCE OF FINAL ACCOUNT |
142A |
- |
REMINDER - UNDER CERTIFIED FINAL ACCOUNT |
143A |
- |
REMINDER – LATE PAYMENT FOR FINAL CERTIFICATE |
CLAUSE 37- ARBITRATION |
||
144A |
- |
INVITATION TO DISCUSS DISPUTES & DIFFERENCES
BEFORE INITIATING ARBITRATION |
145A |
- |
NOTIFICATION OF DISPUTE UNDER CLAUSE 37 OF THE
AGREEMENT AND CONDITIONS OF PAM CONTRACT 2018 (WITH QUANTITIES) |
CLAUSE 39 – PERFORMANCE BOND |
||
146A |
- |
SUBMISSION OF PERFORMANCE BOND |
147A |
- |
NOTIFICATION OF COSTS TO EXTEND THE PERFORMANCE BOND |
148A |
- |
REQUEST TO RELEASE PERFORMANCE BOND |
MINUTES OF MEETING |
||
149A |
- |
INVITATION TO SPECIAL TECHNICAL MEETING (INSERT ISSUE) |
150A |
- |
NOTIFICATION TO CORRECT MINUTES OF MEETING |
SUBMISSION OF MONTHLY REPORT |
||
151A |
- |
SUBMISSION OF MONTHLY PROGRESS REPORT – (INSERT MONTH AND YEAR) |
152A |
- |
SUBMISSION OF PROGRESS REPORT NO (INSERT NUMBER) |
REQUEST FOR INFORMATION – RFI |
||
153A |
- |
REQUEST FOR INFORMATION – DETAIL DRAWINGS FOR (INSERT TYPE OF WORKS) |
154A |
- |
REQUEST FOR INFORMATION |
155A |
- |
DELAY IN THE APPROVAL OF SHOP DRAWINGS |
SAFETY ON SITE |
||
156A |
- |
SUBMISSION OF SAFETY PROGRAM |
157A |
- |
SUBMISSION OF SAFETY REPORT |
158A |
- |
SUBMISSION OF ACCIDENT REPORT |
LETTER &
NOTICE TO SUB-CONTRACTOR |
||
LETTER OF INTENT TO SUB-CONTRACTOR |
||
159 |
- |
SURAT NIAT KEPADA SUB-KONTRAKTOR |
159 A |
- |
LETTER OF INTENT TO SUB-CONTRACTOR |
HANDING OVER OF SUB-CONTRACT
DOCUMENTS |
||
160 |
- |
PENYERAHAN DOKUMEN SUBKONTRAK - 1 |
160 A |
- |
RELEASE OF SUBCONTRACT DOCUMENT - 1 |
161 |
- |
PENYERAHAN DOKUMEN SUBKONTRAK - 2 |
161 A |
- |
RELEASE OF SUBCONTRACT DOCUMENT - 2 |
162 |
- |
PENYERAHAN LUKISAN DISEMAK |
162 A |
- |
ISSUANCE OF REVISED DRAWING |
SUB-CONTRACTOR SITE AGENT |
||
163 |
- |
ARAHAN MENGEMUKAKAN EJEN TAPAK SUB-KONTRAKTOR |
163 A |
- |
INSTRUCTION TO SUBMIT PARTICULARS OF SITE AGENT |
164 |
- |
MAKLUMAN KELULUSAN EJEN TAPAK SUB-KONTRAKTOR |
164 A |
- |
NOTICE TO INFORM APPROVAL OF SUB-CONTRACTOR’S SITE
AGENT |
WORK PROGRAM - SUB-CONTRACTOR |
||
165 |
- |
ARAHAN MENGEMUKAKAN WORK PROGRAM |
165 A |
- |
INSTRUCTION TO SUBMIT WORK PROGRAM |
166 |
- |
ARAHAN MENGEMUKAKAN INFO TAMBAHAN - WORK PROGRAM |
166 A |
- |
INSTRUCTION TO SUBMIT ADDITIONAL INFO – WORK PROGRAM |
167 |
- |
MAKLUMAN KELULUSAN WORK PROGRAM SUB-KONTRAKTOR |
167 A |
- |
NOTICE TO INFORM APPROVAL OF SUB-CONTRACTOR’S WORK
PROGRAM |
SURVEY – SUB-CONTRACTOR |
||
168 |
- |
ARAHAN MENYEDIAKAN STESEN KAWALAN UKUR |
168 A |
- |
INSTRUCTION TO PROVIDE SURVEY CONTROL STATIONS |
169 |
- |
ARAHAN MENGEMUKAKAN MAKLUMAT PASUKAN & ALAT UKUR |
169 A |
- |
INSTRUCTION TO SUBMIT DETAILS OF SURVEY TEAM &
EQUIPMENT |
170 |
- |
ARAHAN MENGUKUR ARAS ASAL TANAH |
170 A |
- |
INSTRUCTION TO SURVEY ORIGINAL GROUND LEVEL |
171 |
- |
ARAHAN UNTUK MENGUKUR ARAS UNTUK SETIAP PERINGKAT |
171 1 |
- |
INSTRUCTION TO SURVEY LEVEL & ALIGNMENT FOR
EVERY WORKS |
172 |
- |
ARAHAN MENGEMUKAKAN “AS BUILT DRAWINGS” |
172 A |
- |
INSTRUCTION TO SUBMIT AS BUILT DRAWINGS |
APPROVAL OF MATERIALS –
SUB-CONTRACTOR |
||
173 |
- |
ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 1 |
173 A |
- |
INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 1 |
174 |
- |
ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 2 |
174 A |
- |
INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 2 |
175 |
- |
ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 3 |
175 A |
- |
INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 3 |
176 |
- |
PERINGATAN – MENGEMUKAKAN SAMPEL UNTUK KELULUSAN |
176 A |
- |
REMINDER - TO SUBMIT SAMPLES FOR APPROVAL |
177 |
- |
MAKLUMAN SAMPEL DI TOLAK |
177 A |
- |
NOTIFICATION – SAMPLES REJECTED |
178 |
- |
MAKLUMAN SAMPEL DITLULUSKAN |
178 A |
- |
NOTIFICATION – SAMPLES APPROVED |
METHOD STATEMENT – SUB-CONTRACTOR |
||
179 |
- |
ARAHAN MENGEMUKAKAN METHOD STATEMENT UNTUK KELULUSAN |
179 A |
- |
INSTRUCTION TO SUBMIT METHOD STATEMENT FOR APPROVAL |
180 |
- |
ARAHAN MENGEMUKAKAN MAKLUMAT TAMBAHAN – METHOD
STATEMENT |
180 A |
- |
INSTURCTION TO SUBMIT ADDITIONAL INFOR - METHOD
STATEMENT |
181 |
- |
MAKLUMAN KELULUSAN METHOD STATEMENT |
181 A |
- |
NOTIFICATION TO INFORM APPROVAL OF METHOD STATEMENT |
SAFETY ON SITE – SUB-CONTRACTOR |
||
182 |
- |
ARAHAN MEMATUHI PERATURAN KESELAMATAN TAPAK |
182 A |
- |
INSTRUCTION TO COMPLY WITH SITE SAFETY RULE |
183 |
- |
ARAHAN MENCEGAH WABAK DENGGI DI TAPAK |
183 A |
- |
INSTRUCTION TO PREVENT DENGUE WITHIN SITE |
184 |
- |
ARAHAN MENJAGA KEBERSIHAN TAPAK - 1 |
184 A |
- |
INSTRUCTION TO CARRY OUT HOUSEKEEPING - 1 |
185 |
- |
ARAHAN MENJAGA KEBERSIHAN TAPAK -2 |
185 A |
- |
INSTRUCTION TO CARRY OUT HOUSEKEEPING - 2 |
186 |
- |
AMARAN PELANGGARAN PERATURAN KESELAMATAN |
186 A |
- |
WARNING ON VIOLATION OF SAFETY RULE |
MEETING - SUB-CONTRACTOR |
||
187 |
- |
JEMPUTAN KE MESYUARAT TAPAK |
187 A |
- |
INVITATION TO SITE MEETING |
188 |
- |
ARAHAN MENGHADIRI MESYUARAT TEKNIKAL BERSAMA MAJIKAN |
188 A |
- |
INSTRUCTION TO ATTEND TECHNICAL MEETING WITH CLIENT |
189 |
- |
MAKLUMAN PENANGGUHAN MESYUARAT |
189 A |
- |
NOTIFICATION OF MEETING POSTPONEMENT |
190 |
- |
MAKLUMAN PENGEDARAN MINIT MESYUARAT |
190 A |
- |
NOTIFICATION OF DISTRIBUTION OF MINUTES OF MEETING |
191 |
- |
MAKLUMAN PEMBETULAN MINIT MESYUARAT |
191 A |
- |
NOTIFICATION TO INFORM RECTIFICATION &
AMENDMENTS OF MINUTES |
WEEKLY REPORT- SUB-CONTRACTOR |
||
192 |
- |
ARAHAN MENGEMUKAKAN LAPORAN MINGGUAN |
192 A |
- |
INSTRUCTION TO SUBMIT WEEKLY REPORT |
193 |
- |
ARAHAN MENGEMUKAKAN MAKLUMAT TAMBAHAN |
193 A |
- |
INSTRUCTION TO SUBMIT ADDITIONAL INFO |
EMPLOYER’S COMPLAINT –
SUB-CONTRACTOR |
||
194 |
- |
ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - KUALITI |
194 A |
- |
INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – QUALITY |
195 |
- |
ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - SAFETY |
195 A |
- |
INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – SAFETY |
196 |
- |
ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - SIKAP |
196 A |
- |
INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – ATTITUDE |
INTERIM PAYMENT CERTIFICATE – SUB-CONTRACTOR |
||
197 |
- |
ARAHAN MENGEMUKAKAN PERMOHONAN BAYARAN |
197 A |
- |
INSTRUCTION TO SUBMIT PAYMENT APPLICATION |
198 |
- |
NOTIS MENGEMUKAKAN SIJIL BAYARAN |
198 A |
- |
NOTICE TO INFORM ISSUANCE OF PAYMENT CERTIFICATE |
QUALITY – SUB-CONTRACTOR |
||
199 |
- |
ARAHAN MENUKAR KERJA TIDAK BERKUALITI |
199 A |
- |
INSTRUCTION TO REMOVE & REDO POOR QUALITY WORKS |
200 |
- |
ARAHAN MENUKAR BAHAN BINAAN TIDAK BERKUALITI |
200 A |
- |
INSTRUCTION TO REMOVE & REINSTALL POOR QUALITY
MATERIALS |
201 |
- |
NOTIS MEMAKLUMKAN KEGAGALAN UJIAN KUALITI |
201 A |
- |
NOTICE TO INFORM FAILURE IN QUALITY TEST |
VARIATION ORDER – SUB-CONTRACTOR |
||
202 |
- |
ARAHAN MELAKSANAKAN KERJA PERUBAHAN - 1 |
202 A |
- |
INSTRUCTION FOR VARIATION WORKS - 1 |
203 |
- |
ARAHAN MELAKSANAKAN KERJA PERUBAHAN - 2 |
203 A |
- |
INSTRUCTION FOR VARIATION WORKS - 2 |
204 |
- |
MENYERAHKAN LUKISAN PERUBAHAN |
204 A |
- |
RELEASE OF V.O’s DRAWING |
205 |
- |
ARAHAN MENGEMUKAKAN SEBUTHARGA UNTUK KERJA V.O |
205 A |
- |
INSTRUCTION TO SUBMIT QUOTATION FOR V.O WORKS |
206 |
- |
ARAHAN MENGEMUKAKAN INFO TAMBAHAN SEBUTHARGA UNTUK
KERJA V.O |
206 A |
- |
INSTRUCTION TO SUBMIT ADDITIONAL INFO FOR QUOTATION
OF V.O WORKS |
EXTENSION OF TIME
– SUB-CONTRACTOR |
||
207 |
- |
NOTIS MEMAKLUMKAN KELULUSAN EOT - 1 |
207 A |
- |
NOTICE TO INFORM EOT APPROVAL - 1 |
208 |
- |
NOTIS MEMAKLUMKAN KELULUSAN EOT - 2 |
208 A |
- |
NOTICE TO INFORM EOT APPROVAL - 2 |
209 |
- |
NOTIS MEMAKLUMKAN KELULUSAN EOT - 3 |
209 A |
- |
NOTICE TO INFORM EOT APPROVAL - 3 |
210 |
- |
NOTIS MEMAKLUMKAN PERMOHONAN EOT DITOLAK |
210 A |
- |
NOTICE TO INFORM EOT APPLICATION WAS REJECTED |
211 |
- |
ARAHAN MENGEMUKAKAN INFO TAMBAHAN – PERMOHONAN EOT -1 |
211 A |
- |
INSTRUCTION TO SUBMIT FURTHER INFO – EOT - 1 |
212 |
- |
ARAHAN MENGEMUKAKAN INFO TAMBAHAN – PERMOHONAN EOT -1 |
212 A |
- |
INSTRUCTION TO SUBMIT FURTHER INFO – EOT - 1 |
213 |
- |
ARAHAN MENGEMUKAKAN ANALISA CRITICAL PATH METHOD |
213 A |
- |
INSTRUCTION TO SUBMIT CRITICAL PATH METHOD ANALYSIS |
214 |
- |
ARAHAN MENGEMUKAKAN PENGIRAAN MASA EOT |
214 A |
- |
INSTRUCTION TO SUBMIT TIME CALCULATION |
WORKERS ATTENDANCE – SUB-CONTRACTOR |
||
215 |
- |
AMARAN BILANGAN PEKERJA TIDAK MENGIKUT JADUAL WORK
PROGRAM |
215 A |
- |
WARNING NUMBER OF WORKERS DID NOT MATCH WITH WORK
PROGRAM |
216 |
- |
AMARAN BILANGAN PEKERJA DITAPAK TIDAK MENCUKUPI |
216 A |
- |
WARNING NOTIFICATION OF NON-SUFFICIENT LABOUR ON
SITE |
DELAY – SUB-CONTRACTOR |
||
217 |
- |
AMARAN KERJA LAMBAT & NIAT UNTUK MENUNTUT
GANTIRUGI LAD - 1 |
217 A |
- |
NOTICE OF DELAY & INTENTION TO IMPOSE LAD - 1 |
218 |
- |
AMARAN KERJA LAMBAT & NIAT UNTUK MENUNTUT
GANTIRUGI LAD - 1 |
218 A |
- |
NOTICE OF DELAY & INTENTION TO IMPOSE LAD - 1 |
219 |
- |
AMARAN KELAMBATAN & NIAT UNTUK MENGAMBIL ALIH
SEBAHAGIAN KERJA |
219 A |
- |
NOTICE OF DELAY & INTENTION TO PARTIALLY TAKE
OVER WORKS |
220 |
- |
AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN SUMBER |
220 A |
- |
NOTICE OF DELAY DUE TO LACK OF RESOURCES |
221 |
- |
AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN PEKERJA
- 1 |
221 A |
- |
NOTICE OF DELAY DUE TO LACK OF WORKERS - 1 |
222 |
- |
AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN PEKERJA
- 2 |
222 A |
- |
NOTICE OF DELAY DUE TO LACK OF WORKERS - 2 |
223 |
- |
AMARAN KELAMBATAN DISEBABKAN KEKURANGAN MESIN |
223 A |
- |
NOTICE OF DELAY DUE TO LACK OF MACHINERIES |
224 |
- |
NOTIS MENGAMBIL ALIH SEBAHAGIAN KERJA |
224 A |
- |
NOTICE TO TAKE OVER PART OF SUB-CONTRACT WORKS |
CERTIFICATE OF NON-COMPLETION (CNC)
– SUB-CONTRACTOR |
||
225 |
- |
MAKLUMAN PENUERAHAN PERAKUAN TIDAK SIAP KERJA |
225 A |
- |
NOTICE TO INFORM NON-COMPLETION OF WORKS |
NOTICE OF DEFAULT – SUB-CONTRACTOR |
||
226 |
- |
NOTIS KEMUNGKIRAN UNTUK MENAMATKAN KONTRAK - 1 |
226 A |
- |
NOTICE OF DEFAULT TO TERMINATE SUBCONTRACT - 1 |
227 |
- |
NOTIS KEMUNGKIRAN UNTUK MENAMATKAN KONTRAK - 2 |
227 A |
- |
NOTICE OF DEFAULT TO TERMINATE SUBCONTRACT - 2 |
DETERMINATION – SUB-CONTRACTOR |
||
228 |
- |
NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 1 |
228 A |
- |
NOTICE TO TERMINATE SUB-CONTRACT - 1 |
229 |
- |
NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 2 |
229 A |
- |
NOTICE TO TERMINATE SUB-CONTRACT - 2 |
230 |
- |
NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 3 |
230 A |
- |
NOTICE TO TERMINATE SUB-CONTRACT - 3 |
PRACTICAL COMPLETION – SUB-CONTRACTOR |
||
231 |
- |
NOTIS MEMAKLUMKAN PERAKUAN PENYIAPAN KERJA PRAKTIKAL |
231 A |
- |
NOTICE TO INFORM PRACTICAL COMPLETION |
DEFECTS – SUB-CONTRACTOR |
||
232 |
- |
ARAHAN MEMBAIKI KECACATAN DENGAN SEGERA |
232 A |
- |
INSTRUCTION TO URGENTLY RECTIFY DEFECT |
233 |
- |
ARAHAN MEMBAIKI JADUAL KECACATAN TERAKHIR |
233 A |
- |
INSTRUCTION TO RECTIFY FINAL DEFECT LIST |
234 |
- |
NOTIS KEGAGALAN DAN MELANTIK PIHAK KETIGA |
234 A |
- |
NOTICE OF FAILURE TO RECTIFY DEFECT AND THIRD PARTY
APPOINTMENT |
235 |
- |
NOTIS PERAKUAN SIAP MEMBAIKI KECACATAN |
235 A |
- |
NOTICE TO ISSUE CERTIFICATE OF MAKING GOOD DEFECT |
FINAL ACCOUNT – SUB-CONTRACTOR |
||
236 |
- |
ARAHAN MENGEMUKAKAN MAKLUMAT LENGKAP UNTUK AKAUN
MUKTAMAD |
236 A |
- |
INSTRUCTION TO SUBMT DETAIL PARTICULARS FOR FINAL
ACCOUNT |
237 |
- |
NOTIS PENYERAHAN AKAUN MUKTAMAD |
237 A |
- |
NOTICE TO ISSUE FINAL PAYMENT CERTIFICATE |