July 21, 2024

EBOOK 4 (PAM 2018 CONTRACT - NOMINATED SUB-CONTRACTOR) - OVERVIEW

 

OVERVIEW

This book is for Project Managers, Aspiring Young Engineers, and Construction Company business owners.

To Project Managers who is always on a struggle to generate effective correspondences based on requirement set under PAM Sub-Contract 2018, this book is designed to address your daily project communication problem. The content of this book is designed to guide and give ideas to your project team on how and when to generate effective correspondences based on procedures stipulated under PAM 2018 Standard Form of Sub-Contract. In addition, this book also provides templates for correspondences with your Sub-Contractors. By having 328 templates which we provided in this book, the struggles to write important correspondences and notices will be minimised and thus save your team precious time.

To those aspiring young Engineers who are determine to become successful Project Manager in the near future, this book will help you achieve that dream faster. Templates provided in this book, will enable you to assist your current Project Manager to generate important correspondences that are effective and accurate in their contents. By doing so, you will help him saving his valuable time in responding to any event that happen in your project. You will gain his trust and this will surely push your career up to the next level and open the door to more opportunities and promotions.

To Construction Company business owners, this book will help you monitor and control your project team communication performance.

By having the templates provided in this book, you could persuade and ensure your project team to record all important events happen during the course of your project without fail, especially events which entitled you to claim for additional expenditure caused by variation orders, extension of time due to fault of others and compensation for loss and expense incurred during the extension of time period. Having this template book will ensure that your company rights to claim for remedies provided under the contract are always protected and preserved. This will help you to improve your project cash flow.

This book contains 328 templates. They are useful in guiding your project team to generate effective communication and provide contemporaneous records based on situations that your team may encounter during the course of the project. There are situations where your team will have to face with difficult Employers and Consultants and there will also be situations where your team will have to face with difficult Sub-contractors and Supplier. To address to all of these challenges, you need to effectively communicate with these parties. Effective communication is the major step to resolve conflict and avoid dispute. And in case dispute still arises even after your team have effectively communicated the issues, you will then have the benefit of having complete records from your correspondences. These records will help providing evidence to support your case and win the dispute. This is important if the dispute involves issues with regard to time and expenses.

All templates were drafted based on procedural requirement of certain selected PAM 2018 Sub-Contract clauses.








July 20, 2024

EBOOK 4 (PAM 2018 CONTRACT - NOMINATED SUB-CONTRACTOR) - CONTENT

 CONTENT

LETTER TO ARCHITECT AND EMPLOYER

CLAUSE 1.4 – DISCREPANCY BETWEEN CONTRACT DOCUMENTS

1A

-

DISCREPANCY BETWEEN DRAWINGS AND BILL OF QUANTITIES - 1

2A

-

DISCREPANCY BETWEEN DRAWINGS AND BILL OF QUANTITIES - 2

3A

-

DISCREPANCY BETWEEN DRAWINGS – (DISCREPANCY IN DIMENSION)

4A

-

DISCREPANCY BETWEEN CONTRACT DOCUMENTS – A VARITION

5A

-

DISCREPANCY AMONG CONTRACT DOCUMENTS – NOT A VARIATION

6A

-

DISCREPANCY BETWEEN CONTRACT DOCUMENTS – LATE RESPONSE

CLAUSE 2 – ARCHITECT’S INSTRUCTIONS

7A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING TELE-CONVERSATION

8A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING SITE VISIT

9A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING SITE MEETING

10A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED BY CLERK OF WORK

11A

-

REQUEST AI FOR V.O WORKS – OBSTRUCTION BY ROCK

12A

-

REQUEST AI FOR V.O WORKS – OBSTRUCTION BY UTILITY

13A

-

DELAY IN RECEIVING AI – TO RESOLVE OBSTRUCTION

14A

-

CONFIRMATION OF ARCHITECT’S INSTRUCTION FOR VARITION ORDER

CLAUSE 3 – CONTRACT DOCUMENTS & WORK PROGRAM & SHOP DRAWINGS

15A

-

NOTICE TO REMIND ARCHITECT – YET TO RECIVE CONTRACT DOCUMENTS

16A

-

NOTICE TO INFORM ARCHITECT - DATE WE RECEIVED CONTRACT DOCUMENTS

17A

-

SUBMISSION OF MASTER WORK PROGRAM

18A

-

SUBMISSION OF REVISED MASTER WORK PROGRAM

19A

-

REMINDER – REQUEST RESPONSE TO MASTER WORK PROGRAM

20A

-

SUBMISSION OF SHOP DRAWINGS FOR MAIN CONTRACT WORKS

21A

-

SUBMISSION OF SHOP DRAWINGS FOR ELECTRICAL WORKS

22A

-

SUBMISSION OF SHOP DRAWINGS FOR MECHANICAL WORKS

CLAUSE 4 – STATUTORY OLIGATIONS

23A

-

LOCAL AUTHORITY APPROVAL FOR SITE OFFICE , STORES & WORKER QUARTERS

24A

-

LOCAL AUTHORITY REQUEST FOR SILT TRAP

25A

-

APPROVAL FOR ELECTRICTY, TELEPHONE AND WATER SUPPLY TO THE SITE OFFICE

CLAUSE 5 – LEVELS AND SETTING OUT

26A

-

REQUEST INFORMATION FOR SETTING OUT

27A

-

SUBMISSION OF A TOPOGRAPHICAL SURVEY DATA

28A

-

DISCREPANCY BETWEEN EXISTING GROUND LEVEL AND CONTRACT DRAWIN

CLAUSE 6 – MATERIALS, GOODS AND WORKMANSHIP

29A

-

SUBMISSION OF SAMPLES (INSERT MATERIAL NAME)

30A

-

REQUEST REASON FOR REJECTION OF SAMPLE (INSERT MATERIAL NAME)

31A

-

NOTICE TO REMIND - LATE APPROVAL FOR SAMPLE (INSERT MATERIAL NAME)

32A

-

SUBMISSION OF METHOD STATEMENT (INSERT TYPE OF WORK)

33A

-

SUBMISSION OF METHOD STATEMENT TO RECTIFY DEFECT

34A

-

NOTICE TO REMIND - LATE APPROVAL OF METHOD STATEMENT

35A

-

TESTING UNDER CLAUSE 6.3

CLAUSE 8 – SITE AGENT

36A

-

PROPOSED PROJECT MANAGER - SITE AGENT

37A

-

PROPOSED REPLACEMENT OF PROJECT MANAGER – SITE AGENT

38A

-

REQUEST TO EXTEND WORKING HOURS & SUPERVISION

39A

-

REQUEST TO EXTEND WORKING HOURS & SUPERVISION

CLAUSE 11.1 – 11.4, – VARIATION WORKS

40A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING TELE-CONVERSATION

41A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING SITE VISIT

42A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED DURING SITE MEETING

43A

-

REQUEST AI FOR V.O WORKS – ORAL INSTRUCTION ISSUED BY CLERK OF WORK

44A

-

REQUEST AI FOR V.O WORKS – OBSTRUCTION BY ROCK

45A

-

REQUEST AI FOR V.O WORKS – OBSTRUCTION BY UTILITY

46A

-

DELAY IN RECEIVING AI – TO RESOLVE OBSTRUCTION

CLAUSE 11.5 – 11.9 – VALUATION OF VARIATION

47A

-

QUOTATION FOR V.O (INSERT NO) & INTENTION TO CLAIM  FOR EOT & ADDITIONAL EXPENSES

48A

-

SUBMISSION OF DETAIL FOR ADDITIONAL EXPENSE DUE TO V.O WORKS – CL 11.7(b)

48AB

-

QUOTATION FOR V.O (MARKET RATE) & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES

49A

-

SUBMISSION OF DETAIL FOR ADDITIONAL EXPENSE DUE TO V.O WORKS – CL 11.7(b)

49AB

-

QUOTATION FOR V.O (OLD & NEW RATE) & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES

50A

-

QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES

51A

-

QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES

52A

-

QUOTATION FOR V.O WORKS & INTENTION TO CLAIM FOR EOT & ADDITIONAL EXPENSES

53A

-

REMINDER DUE TO LATE RESPONSE TO QUOTATION FOR V.O (INSERT NUMBER)

54A

-

VARIATION ORDER NO (INSERT NO) - DISAGREEMENT WITH RATE PROPOSED BY QS

55A

-

MONTHLY NOTICE TO CLAIM ADDITIONAL EXPENSES DUE TO V.O WORKS – CLAUSE 11.7 (a)

56A

-

MONTHLY SUBMISSION OF DETAIL & PARTICULARS FOR ADDITIONAL EXPENSES - CLAUSE 11.7 (b)

CLAUSE 12 – CONTRACT BILLS

57A

-

NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS)

58A

-

NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS

59A

-

NOTICE TO INFORM BQ IS UNDER MEASURED - (DESCRIBE SCOPE OF WORKS)

60A

-

NOTICE TO INFORM THAT DESCRIPTION OF WORKS IN BOQ IS WRONG (INSERT ITEM NAME)

61A

-

NOTICE TO INFORM THAT ACTUAL SITE QTY HIGHER THAN QUANTITY STATED IN BOQ (INSERT ITEM NAME)

CLAUSE 15.1 – 15.3 –  PRACTICAL COMPLETION

62A

-

NOTIFICATION TO CARRY OUT TESTING AND COMMISSIONING

63A

-

REQUEST FOR JOIN SITE INSPECTION AND CERTIFICATE OF PRACTICAL COMPLETION

64A

-

REQUEST FOR JOIN SITE INSPECTION AND CERTIFICATE OF PRACTICAL COMPLETION

65A

-

OBJECTION TO ARCHITECT’S DECISION TO WITHHOLD THE ISSUANCE OF CPC

66A

-

OBJECTION TO ARCHITECT’S DECISION TO WITHHOLD CPC DUE TO DEFECTS OF MINOR NATURE

67A

 

NOTICE TO RETURN SITE POSSESSION TO EMPLOYER

CLAUSE 15.4 – 15.6 –  DEFECT LIABILITY PERIOD

68A

-

SUBMISSION OF SCHEDULE FOR MAKING GOOD DEFECT

69A

-

REQUEST FOR INSPECTION  - COMPLETION OF MAKING GOOD DEFECT

70A

-

PROTEST AGAINST APPOINTMENT OF OTHER THIRD PARTY TO RECTIFY DEFECTS

71A

-

NOTICE TO INFORM THE FOURTEEN (14) DAYS PERIOD HAD LAPSED

72A

-

NOTICE TO CONFIRM THAT THERE IS NO FINAL DEFECT LIST AND REQUEST FOR CMGD

73A

-

NOTICE TO INFORM THAT FINAL DEFECT LIST IS INEFFECTIVE

74A

-

REQUEST OF CERTIFICATE OF MAKING GOOD DEFECT

75A

-

DELAY IN THE ISSUANCE OF CERTIFICATE OF MAKING GOOD DEFECT

CLAUSE 16 – PARTIAL POSSESSION

76A

-

NOTICE TO HAND OVER FOR PARTIAL OCCUPATION

77A

-

REQUEST FOR CERTIFICATE OF PARTIAL COMPLETION

78A

-

REQUEST FOR RELEASE HALF OF RETENTION FUND FOR THE OCCUPIED PARTS

CLAUSE 19 – INSURANCES

79A

-

SUBMISSION OF INSURANCE COVER NOTE AND PREMIUM RECEIPT

80A

-

SUBMISSION OF INSURANCE POLICY

81A

-

EXTENSION OF INSURANCE COVERAGE

82A

-

NOTICE TO CANCEL INSURANCE POLICY

CLAUSE 21 – DATE OF COMMENCEMENT, POSTPONEMENT & COMPLETION DATE

83A

-

NOTICE TO RECORD LATE SITE POSSESSION – SITE OBSTRUCTION

84A

-

NOTICE TO RECORD LATE SITE POSSESSION -  SITE IS NOT READY

85A

-

REQUEST EOT & LOSS AND EXPENSE DUE TO LATE SITE POSSESSION

CLAUSE 22 – DAMAGE FOR NON-COMPLETION

86A

-

PROTEST AGAINST FAILURE TO CARRY OUT SYSTEMATIC ANALYSIS – CNC INVALID

87A

-

PROTEST AGAINST INVALID CNC - PROJECT TIME FOR COMPLETION BECOMING AT LARGE

88A

-

PROTEST AGAINST INVALID CNC – ENTITLED TO EOT DUE TO OBSTRUCTIONS BY DELAY EVENTS

89A

-

ENTITLED TO EOT - PROTEST AGAINST THE IMPOSITION OF LIQUIDATED AND ASCERTAINED DAMAGES (LAD)

90A

-

PROTEST AGAINST INVALID LAD – VIOLATION OF PROCEDURES UNDER CLAUSE 22.1 & 23.4

CLAUSE 23 – EXTENSION OF TIME

91A

-

MONTHLY NOTICE OF INTENTION TO CLAIM EOT UNDER CLAUSE 23.1 (a)

91AB

-

MONTHLY APPLICATION FOR EOT – CLAUSE 23.1 (b)

92A

-

NOTICE OF INTENTION TO CLAIM EOT – OBSTRUCTION BY ROCK

92AB

-

APPLICATION FOR EOT DUE TO ROCK OBSTRUCTION – CL23.1(b)

93A

-

NOTICE OF INTENTION TO CLAIM EOT – INCLEMENT WEATHER

93AB

-

APPLICATION FOR EOT DUE TO INCLEMENT WEATHER – CL 23.1 (b)

94A

-

NOTICE OF INTENTION TO CLAIM EOT – SITE OBSTRUCTIONS

94AB

-

APPLICATION FOR EOT DUE TO SITE OBSTRUCTION – CL 23.1 (b)

95A

-

NOTICE OF INTENTION TO CLAIM EOT – UTILITY OBSTRUCTION

95AB

-

APPLICATION FOR EOT DUE TO UTILITY OBSTRUCTION – CL23.1(b)

96A

-

NOTICE OF INTENTION TO CLAIM EOT – ACT OF PREVENTION (LATE PAYMENT)

96AB

-

APPLICATION FOR EOT DUE TO ACT OF PREVENTION (LATE PAYMENT) – CL 23.1(b)

97A

-

NOTICE OF INTENTION TO CLAIM EOT -  ADDITONAL V.O WORKS

97AB

-

APPLICATION FOR EOT DUE TO ADDITIONAL WORKS – CL 23.1(b)

98A

-

NOTICE OF INTENTION TO CLAIM EOT -  LATE RESPONSE OF RFI

98AB

-

APPLICATION FOR EOT DUE TO LATE RESPONSE OF RFI – CL 23.1 (b)

99A

-

NOTICE OF INTENTION TO CLAIM EOT – TERMINATION OF NSC

99AB

-

APPLICATION FOR EOT DUE TO TERMINATION OF NSC – CL 23.1 (b)

100A

-

NOTICE TO CLAIM EOT – LATE NOMINATION OF NSC

100AB

-

APPLICATION FOR EOT DUE TO LATE NOMINATION OF NSC – CL 23.1(b)

101A

-

NOTICE OF INTENTION TO CLAIM EOT - DELAY BY THIRD PARTY ENGAGED BY EMPLOYER

101AB

-

APPLICATION FOR EOT DUE TO DELAY BY THIRD PARTY ENGAGED BY EMPLOYER – CL23.1(b)

102A

-

PROTEST AGAINST INSUFFICIENT EXTENSION OF TIME

103A

-

PROTEST AGAINST INSUFFICIENT EXTENSION OF TIME - REMINDER

104A

-

PROTEST AGAINST FAILURE TO PROPERLY ADMINISTER CLAUSE 22 & 23 OF THE CONTRACT

105A

-

REBUT ALLEGATION OF POOR PROGRESS & BEST ENDEAVOUR

106A

-

PROPOSED MITIGATION MEASURES TO REDUCE DELAY & ACCELERATION COST

CLAUSE 24 – LOSS AND EXPENSE

107A

-

MONTHLY NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE – CL 24.1 (a)

107AB

-

MONTHLY APLICATION FOR LOSS & EXPENSE CLAIM – CL 24.1 (b)

108A

-

NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE –  LATE RESPONSE TO RFI

108AB

-

APPLICATION FOR LOSS & EXPENSE DUE TO LATE RESPONSE TO RFI – CL 24.1 (b

109A

-

NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE – LATE NOMINATION OF NSC

109AB

 

APPLICATION FOR LOSS & EXPENSE DUE TO LATE NOMINATION OF NSC – CL 24.1 (b)

110A

 

NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE  - SUSPENSION UNDER CLAUSE 30.7

110AB

 

APPLICATION FOR LOSS & EXPENSE DUE TO SUSPENSION UNDER CLAUSE 30.7 – CL 24.1(b)

111A

 

NOTICE OF INTENTION TO CLAIM LOSS & EXPENSE DUE TO LATE SUPPLY OF GOODS BY EMPLOYER

111AB

 

APPLICATION FOR LOSS & EXPENSE DUE TO LATE SUPPLY OF GOODS BY EMPLOYER – CL 24.1 (b)

112A

 

PROTEST AGAINST UNDER CERTIFICATION OF LOSS & EXPENSE

CLAUSE  25 – DETERMINATION BY EMPLOYER

113A

-

PROTEST AGAINST DEFAULT NOTICE – FAILURE  DUE TO LATE PAYMENT

114A

-

REPLY TO DEFAULT NOTICE – COMMITMENT TO ACCELERATE PROGRESS

CLAUSE  26 – DETERMINATION BY CONTRACTOR

115A

-

NOTICE OF DEFAULT  - EMPLOYER’S FAILURE TO MAKE PAYMENT FOR CERTIFICATE NO (INSERT P.C NO)

116A

-

NOTICE OF DEFAULT  - EMPLOYER’S FAILURE TO MAKE SEVERAL PAYMENTS

117A

-

NOTICE TO DETERMINE OWN EMPLOYMENT  - DUE TO EMPLOYER’S BREACH OF CONTRACT

CLAUSE  27 – NOMINATED SUB-CONTRACTOR

118A

-

REMINDER  - DELAY IN THE ISSUANCE OF NOMINATION INSTRUCTION FOR THE APPOINTMENT OF NSC

119A

-

PROTEST AGAINST THE APPOINTMENT OF (INSERT CO NAME) AS NSC DUE TO LOW PRICING

120A

-

PROTEST AGAINST THE APPOINTMENT OF (INSERT CO NAME) AS NSC DUE TO POOR PAST PERFORMANCE

121A

-

PAYMENT TO NSC – DEDUCTION FOR DEFECTS RECTIFICATION COSTS

122A

-

PAYMENT TO NSC – DEDUCTION FOR LAD CHARGES

CLAUSE 30.1 – 30.4 – CERTIFICATES AND PAYMENTS

123A

-

SUBMISSION OF PAYMENT APPLICATION NO (INSERT NUMBER) - 1

124A

-

SUBMISSION OF PAYMENT APPLICATION NO (INSERT NUMBER) - 2

125A

-

REQUEST FOR OVERDUE PAYMENT CERTIFICATE (INSERT NUMBER) - 1

126A

-

REQUEST FOR OVERDUE PAYMENT CERTIFICATE (INSERT NUMBER) - 2

127A

-

PROTEST AGAINST UNDER CERTIFIED PAYMENT CERTIFICATE (INSERT NUMBER)

128A

-

PROTEST AGAINST UNDER CERTIFIED PAYMENT CERTIFICATE – V.O WORKS

129A

-

PROTEST AGAINST LATE PAYMENT AND INTENTION TO CLAIM FOR LATE PAYMENT INTEREST

130A

-

PROTEST AGAINST NON-PAYMENT FOR CERTIFICATE NO (INSERT NO) - 1

131A

-

PROTEST AGAINST LATE PAYMENT FOR CERTIFICATE NO (INSERT NO) - 2

CLAUSE 30.5 – 30.6 – RETENTION FUND

132A

-

REQUEST FOR RETENTION MONEY TO BE KEPT INTO A TRUST ACCOUNT

133A

-

REMINDER - RETENTION MONEY TO BE PAID INTO TRUST ACCOUNT

134A

-

REQUEST TO RELEASE ONE HALF OF RETENTION FUND AFTER ISSUANCE OF CPC

135A

-

REMINDER - RELEASE ONE HALF OF RETENTION FUND AFTER ISSUANCE OF CPC

136A

-

REQUEST TO RELEASE ONE HALF OF RETENTION FUND AFTER ISSUANCE OF CMGD

CLAUSE 30.7 – SUSPENSION OF WORKS

137A

-

NOTICE OF INTENTION TO SUSPEND WORKS DUE TO PAYMENT ISSUE

138A

-

NOTICE TO SUSPEND WORKS DUE TO PAYMENT ISSUE

CLAUSE 30.10 – FINAL ACCOUNT AND PAYMENT

139A

-

SUBMISSION OF DETAILS AND PARTICULARS FOR FINAL ACCOUNT

140A

-

SUBMISSION OF DETAILS AND PARTICULARS FOR FINAL ACCOUNT

141A

-

REMINDER – LATE ISSUANCE OF FINAL ACCOUNT

142A

-

REMINDER - UNDER CERTIFIED FINAL ACCOUNT

143A

-

REMINDER – LATE PAYMENT FOR FINAL CERTIFICATE

CLAUSE 37-  ARBITRATION

144A

-

INVITATION TO DISCUSS DISPUTES & DIFFERENCES BEFORE INITIATING ARBITRATION

145A

-

NOTIFICATION OF DISPUTE UNDER CLAUSE 37 OF THE AGREEMENT AND CONDITIONS OF PAM CONTRACT 2018 (WITH QUANTITIES)

CLAUSE 39 – PERFORMANCE BOND

146A

-

SUBMISSION OF PERFORMANCE BOND

147A

-

NOTIFICATION OF COSTS TO EXTEND THE PERFORMANCE BOND

148A

-

REQUEST TO RELEASE PERFORMANCE BOND

MINUTES OF MEETING

149A

-

INVITATION TO SPECIAL TECHNICAL MEETING (INSERT ISSUE)

150A

-

NOTIFICATION TO CORRECT MINUTES OF MEETING

SUBMISSION OF MONTHLY REPORT

151A

-

SUBMISSION OF MONTHLY PROGRESS REPORT – (INSERT MONTH AND YEAR)

152A

-

SUBMISSION OF PROGRESS REPORT NO (INSERT NUMBER)

REQUEST FOR INFORMATION – RFI

153A

-

REQUEST FOR INFORMATION – DETAIL DRAWINGS FOR (INSERT TYPE OF WORKS)

154A

-

REQUEST FOR INFORMATION

155A

-

DELAY IN THE APPROVAL OF SHOP DRAWINGS

SAFETY ON SITE

156A

-

SUBMISSION OF SAFETY PROGRAM

157A

-

SUBMISSION OF SAFETY REPORT

158A

-

SUBMISSION OF ACCIDENT REPORT

LETTER & NOTICE TO SUB-CONTRACTOR

LETTER OF INTENT TO SUB-CONTRACTOR

159

-

SURAT NIAT KEPADA SUB-KONTRAKTOR

159 A

-

LETTER OF INTENT TO SUB-CONTRACTOR

HANDING OVER OF SUB-CONTRACT DOCUMENTS

160

-

PENYERAHAN DOKUMEN SUBKONTRAK - 1

160 A

-

RELEASE OF SUBCONTRACT DOCUMENT - 1

161

-

PENYERAHAN DOKUMEN SUBKONTRAK - 2

161 A

-

RELEASE OF SUBCONTRACT DOCUMENT - 2

162

-

PENYERAHAN LUKISAN DISEMAK

162 A

-

ISSUANCE OF REVISED DRAWING

SUB-CONTRACTOR SITE AGENT

163

-

ARAHAN MENGEMUKAKAN EJEN TAPAK SUB-KONTRAKTOR

163 A

-

INSTRUCTION TO SUBMIT PARTICULARS OF SITE AGENT

164

-

MAKLUMAN KELULUSAN EJEN TAPAK SUB-KONTRAKTOR

164 A

-

NOTICE TO INFORM APPROVAL OF SUB-CONTRACTOR’S SITE AGENT

WORK PROGRAM - SUB-CONTRACTOR

165

-

ARAHAN MENGEMUKAKAN WORK PROGRAM

165 A

-

INSTRUCTION TO SUBMIT WORK PROGRAM

166

-

ARAHAN MENGEMUKAKAN INFO TAMBAHAN - WORK PROGRAM

166 A

-

INSTRUCTION TO SUBMIT ADDITIONAL INFO – WORK PROGRAM

167

-

MAKLUMAN KELULUSAN WORK PROGRAM SUB-KONTRAKTOR

167 A

-

NOTICE TO INFORM APPROVAL OF SUB-CONTRACTOR’S WORK PROGRAM

SURVEY – SUB-CONTRACTOR

168

-

ARAHAN MENYEDIAKAN STESEN KAWALAN UKUR

168 A

-

INSTRUCTION TO PROVIDE SURVEY CONTROL STATIONS

169

-

ARAHAN MENGEMUKAKAN MAKLUMAT PASUKAN & ALAT UKUR

169 A

-

INSTRUCTION TO SUBMIT DETAILS OF SURVEY TEAM & EQUIPMENT

170

-

ARAHAN MENGUKUR ARAS ASAL TANAH

170 A

-

INSTRUCTION TO SURVEY ORIGINAL GROUND LEVEL

171

-

ARAHAN UNTUK MENGUKUR ARAS UNTUK SETIAP PERINGKAT

171 1

-

INSTRUCTION TO SURVEY LEVEL & ALIGNMENT FOR EVERY WORKS

172

-

ARAHAN MENGEMUKAKAN “AS BUILT DRAWINGS”

172 A

-

INSTRUCTION TO SUBMIT AS BUILT DRAWINGS

APPROVAL OF MATERIALS – SUB-CONTRACTOR

173

-

ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 1

173 A

-

INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 1

174

-

ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 2

174 A

-

INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 2

175

-

ARAHAN MENGEMUKAKAN SAMPEL BAHAN UNTUK KELULUSAN – 3

175 A

-

INSTRUCTION TO SUBMIT SAMPLES FOR APPROVAL – 3

176

-

PERINGATAN – MENGEMUKAKAN SAMPEL UNTUK KELULUSAN

176 A

-

REMINDER - TO SUBMIT SAMPLES FOR APPROVAL

177

-

MAKLUMAN SAMPEL DI TOLAK

177 A

-

NOTIFICATION – SAMPLES REJECTED

178

-

MAKLUMAN SAMPEL DITLULUSKAN

178 A

-

NOTIFICATION – SAMPLES APPROVED

METHOD STATEMENT – SUB-CONTRACTOR

179

-

ARAHAN MENGEMUKAKAN METHOD STATEMENT UNTUK KELULUSAN

179 A

-

INSTRUCTION TO SUBMIT METHOD STATEMENT FOR APPROVAL

180

-

ARAHAN MENGEMUKAKAN MAKLUMAT TAMBAHAN – METHOD STATEMENT

180 A

-

INSTURCTION TO SUBMIT ADDITIONAL INFOR - METHOD STATEMENT

181

-

MAKLUMAN KELULUSAN METHOD STATEMENT

181 A

-

NOTIFICATION TO INFORM APPROVAL OF METHOD STATEMENT

SAFETY ON SITE – SUB-CONTRACTOR

182

-

ARAHAN MEMATUHI PERATURAN KESELAMATAN TAPAK

182 A

-

INSTRUCTION TO COMPLY WITH SITE SAFETY RULE

183

-

ARAHAN MENCEGAH WABAK DENGGI DI TAPAK

183 A

-

INSTRUCTION TO PREVENT DENGUE WITHIN SITE

184

-

ARAHAN MENJAGA KEBERSIHAN TAPAK - 1

184 A

-

INSTRUCTION TO CARRY OUT HOUSEKEEPING - 1

185

-

ARAHAN MENJAGA KEBERSIHAN TAPAK -2

185 A

-

INSTRUCTION TO CARRY OUT HOUSEKEEPING - 2

186

-

AMARAN PELANGGARAN PERATURAN KESELAMATAN

186 A

-

WARNING ON VIOLATION OF SAFETY RULE

MEETING - SUB-CONTRACTOR

187

-

JEMPUTAN KE MESYUARAT TAPAK

187 A

-

INVITATION TO SITE MEETING

188

-

ARAHAN MENGHADIRI MESYUARAT TEKNIKAL BERSAMA MAJIKAN

188 A

-

INSTRUCTION TO ATTEND TECHNICAL MEETING WITH CLIENT

189

-

MAKLUMAN PENANGGUHAN MESYUARAT

189 A

-

NOTIFICATION OF MEETING POSTPONEMENT

190

-

MAKLUMAN PENGEDARAN MINIT MESYUARAT

190 A

-

NOTIFICATION OF DISTRIBUTION OF MINUTES OF MEETING

191

-

MAKLUMAN PEMBETULAN MINIT MESYUARAT

191 A

-

NOTIFICATION TO INFORM RECTIFICATION & AMENDMENTS OF MINUTES

WEEKLY REPORT- SUB-CONTRACTOR

192

-

ARAHAN MENGEMUKAKAN LAPORAN MINGGUAN

192 A

-

INSTRUCTION TO SUBMIT WEEKLY REPORT

193

-

ARAHAN MENGEMUKAKAN MAKLUMAT TAMBAHAN

193 A

-

INSTRUCTION TO SUBMIT ADDITIONAL INFO

EMPLOYER’S COMPLAINT – SUB-CONTRACTOR

194

-

ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - KUALITI

194 A

-

INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – QUALITY

195

-

ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - SAFETY

195 A

-

INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – SAFETY

196

-

ARAHAN SUPAYA MEMATUHI ADUAN MAJIKAN - SIKAP

196 A

-

INSTRUCTION TO ABIDE BY CLIENT’S COMPLAINT – ATTITUDE

INTERIM PAYMENT CERTIFICATE – SUB-CONTRACTOR

197

-

ARAHAN MENGEMUKAKAN PERMOHONAN BAYARAN

197 A

-

INSTRUCTION TO SUBMIT PAYMENT APPLICATION

198

-

NOTIS MENGEMUKAKAN SIJIL BAYARAN

198 A

-

NOTICE TO INFORM ISSUANCE OF PAYMENT CERTIFICATE

QUALITY – SUB-CONTRACTOR

199

-

ARAHAN MENUKAR KERJA TIDAK BERKUALITI

199 A

-

INSTRUCTION TO REMOVE & REDO POOR QUALITY WORKS

200

-

ARAHAN MENUKAR BAHAN BINAAN TIDAK BERKUALITI

200 A

-

INSTRUCTION TO REMOVE & REINSTALL POOR QUALITY MATERIALS

201

-

NOTIS MEMAKLUMKAN KEGAGALAN UJIAN KUALITI

201 A

-

NOTICE TO INFORM FAILURE IN QUALITY TEST

VARIATION ORDER – SUB-CONTRACTOR

202

-

ARAHAN MELAKSANAKAN KERJA PERUBAHAN - 1

202 A

-

INSTRUCTION FOR VARIATION WORKS - 1

203

-

ARAHAN MELAKSANAKAN KERJA PERUBAHAN - 2

203 A

-

INSTRUCTION FOR VARIATION WORKS - 2

204

-

MENYERAHKAN LUKISAN PERUBAHAN

204 A

-

RELEASE OF V.O’s DRAWING

205

-

ARAHAN MENGEMUKAKAN SEBUTHARGA UNTUK KERJA V.O

205 A

-

INSTRUCTION TO SUBMIT QUOTATION FOR V.O WORKS

206

-

ARAHAN MENGEMUKAKAN INFO TAMBAHAN SEBUTHARGA UNTUK KERJA V.O

206 A

-

INSTRUCTION TO SUBMIT ADDITIONAL INFO FOR QUOTATION OF V.O WORKS

EXTENSION OF TIME – SUB-CONTRACTOR

207

-

NOTIS MEMAKLUMKAN KELULUSAN EOT - 1

207 A

-

NOTICE TO INFORM EOT APPROVAL - 1

208

-

NOTIS MEMAKLUMKAN KELULUSAN EOT - 2

208 A

-

NOTICE TO INFORM EOT APPROVAL - 2

209

-

NOTIS MEMAKLUMKAN KELULUSAN EOT - 3

209 A

-

NOTICE TO INFORM EOT APPROVAL - 3

210

-

NOTIS MEMAKLUMKAN PERMOHONAN EOT DITOLAK

210 A

-

NOTICE TO INFORM EOT APPLICATION WAS REJECTED

211

-

ARAHAN MENGEMUKAKAN INFO TAMBAHAN – PERMOHONAN EOT -1

211 A

-

INSTRUCTION TO SUBMIT FURTHER INFO – EOT - 1

212

-

ARAHAN MENGEMUKAKAN INFO TAMBAHAN – PERMOHONAN EOT -1

212 A

-

INSTRUCTION TO SUBMIT FURTHER INFO – EOT - 1

213

-

ARAHAN MENGEMUKAKAN ANALISA CRITICAL PATH METHOD

213 A

-

INSTRUCTION TO SUBMIT CRITICAL PATH METHOD ANALYSIS

214

-

ARAHAN MENGEMUKAKAN PENGIRAAN MASA EOT

214 A

-

INSTRUCTION TO SUBMIT TIME CALCULATION

WORKERS ATTENDANCE – SUB-CONTRACTOR

215

-

AMARAN BILANGAN PEKERJA TIDAK MENGIKUT JADUAL WORK PROGRAM

215 A

-

WARNING NUMBER OF WORKERS DID NOT MATCH WITH WORK PROGRAM

216

-

AMARAN BILANGAN PEKERJA DITAPAK TIDAK MENCUKUPI

216 A

-

WARNING NOTIFICATION OF NON-SUFFICIENT LABOUR ON SITE

DELAY – SUB-CONTRACTOR

217

-

AMARAN KERJA LAMBAT & NIAT UNTUK MENUNTUT GANTIRUGI LAD - 1

217 A

-

NOTICE OF DELAY & INTENTION TO IMPOSE LAD - 1

218

-

AMARAN KERJA LAMBAT & NIAT UNTUK MENUNTUT GANTIRUGI LAD - 1

218 A

-

NOTICE OF DELAY & INTENTION TO IMPOSE LAD - 1

219

-

AMARAN KELAMBATAN & NIAT UNTUK MENGAMBIL ALIH SEBAHAGIAN KERJA

219 A

-

NOTICE OF DELAY & INTENTION TO PARTIALLY TAKE OVER WORKS

220

-

AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN SUMBER

220 A

-

NOTICE OF DELAY DUE TO LACK OF RESOURCES

221

-

AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN PEKERJA - 1

221 A

-

NOTICE OF DELAY DUE TO LACK OF WORKERS - 1

222

-

AMARAN KELAMBATAN DISEBABKAN KETIDAK CUKUPAN PEKERJA - 2

222 A

-

NOTICE OF DELAY DUE TO LACK OF WORKERS - 2

223

-

AMARAN KELAMBATAN DISEBABKAN KEKURANGAN MESIN

223 A

-

NOTICE OF DELAY DUE TO LACK OF MACHINERIES

224

-

NOTIS MENGAMBIL ALIH SEBAHAGIAN KERJA

224 A

-

NOTICE TO TAKE OVER PART OF SUB-CONTRACT WORKS

CERTIFICATE OF NON-COMPLETION (CNC) – SUB-CONTRACTOR

225

-

MAKLUMAN PENUERAHAN PERAKUAN TIDAK SIAP KERJA

225 A

-

NOTICE TO INFORM NON-COMPLETION OF WORKS

NOTICE OF DEFAULT – SUB-CONTRACTOR

226

-

NOTIS KEMUNGKIRAN UNTUK MENAMATKAN KONTRAK - 1

226 A

-

NOTICE OF DEFAULT TO TERMINATE SUBCONTRACT - 1

227

-

NOTIS KEMUNGKIRAN UNTUK MENAMATKAN KONTRAK - 2

227 A

-

NOTICE OF DEFAULT TO TERMINATE SUBCONTRACT - 2

DETERMINATION – SUB-CONTRACTOR

228

-

NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 1

228 A

-

NOTICE TO TERMINATE SUB-CONTRACT - 1

229

-

NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 2

229 A

-

NOTICE TO TERMINATE SUB-CONTRACT - 2

230

-

NOTIS PENAMATAN KERJA DIBAWAH SUB-KONTRAK - 3

230 A

-

NOTICE TO TERMINATE SUB-CONTRACT - 3

PRACTICAL COMPLETION – SUB-CONTRACTOR

231

-

NOTIS MEMAKLUMKAN PERAKUAN PENYIAPAN KERJA PRAKTIKAL

231 A

-

NOTICE TO INFORM PRACTICAL COMPLETION

DEFECTS – SUB-CONTRACTOR

232

-

ARAHAN MEMBAIKI KECACATAN DENGAN SEGERA

232 A

-

INSTRUCTION TO URGENTLY RECTIFY DEFECT

233

-

ARAHAN MEMBAIKI JADUAL KECACATAN TERAKHIR

233 A

-

INSTRUCTION TO RECTIFY FINAL DEFECT LIST

234

-

NOTIS KEGAGALAN DAN MELANTIK PIHAK KETIGA

234 A

-

NOTICE OF FAILURE TO RECTIFY DEFECT AND THIRD PARTY APPOINTMENT

235

-

NOTIS PERAKUAN SIAP MEMBAIKI KECACATAN

235 A

-

NOTICE TO ISSUE CERTIFICATE OF MAKING GOOD DEFECT

FINAL ACCOUNT – SUB-CONTRACTOR

236

-

ARAHAN MENGEMUKAKAN MAKLUMAT LENGKAP UNTUK AKAUN MUKTAMAD

236 A

-

INSTRUCTION TO SUBMT DETAIL PARTICULARS FOR FINAL ACCOUNT

237

-

NOTIS PENYERAHAN AKAUN MUKTAMAD

237 A

-

NOTICE TO ISSUE FINAL PAYMENT CERTIFICATE